Coordinate the utility work with the site plan
Utility connections can shape the layout and schedule of a development. Quattrone & Associates provides potable water, sanitary sewer, force main, and lift station design for projects in Fort Myers and throughout Southwest Florida. We coordinate the utility plans with the civil design and the approvals needed to put the system into service.
Discuss utilities for your development
Start with service and connection requirements
An existing main near a property does not answer every question about utility service. The proposed use, connection location, available service information, and the utility provider’s requirements all need to be considered.
We bring utility coordination into the site planning process. Pipe routes, grades, access, and other improvements need to fit together before the construction plans are finalized.
Water and wastewater engineering services
- Potable water distribution and main extension design
- Gravity sewer and force main design
- Wastewater lift station design and coordination
- Utility capacity, connection, and service coordination
- FDEP construction permit and clearance packages
- Testing, certification, and record drawing support
The scope depends on the proposed development and the existing systems serving it. A main extension, a new lift station, and changes to an occupied property each call for different design work and coordination.
Keep utility plans aligned with the civil documents
Water and sewer routes need to work with grading, drainage, paving, and the proposed buildings. An adjustment in one plan can affect another. Coordinating these documents helps keep conflicts from carrying into construction.
Our site development engineering and stormwater design services address the related civil work. Utility approvals are coordinated with local providers and the Florida Department of Environmental Protection as applicable.
Plan for the work after construction
Installing the system is only part of the process. Testing, record drawings, certification, and clearance documents may also be needed before the completed facilities can be accepted or placed into service.
Those responsibilities should be discussed while the scope is being established. Our construction administration and closeout services support the coordination and documentation at that stage.
What to send us
Start with the property address or parcel identification number, the proposed use, and a survey or concept plan if available. Existing utility plans, provider correspondence, and any known connection requirements help us understand what has already been established.
If the project is already in design or construction, include the current drawings and outstanding comments. We can discuss the utility engineering and approval work needed from that point.
See our Southwest Florida project portfolio for the types of development our team works on.
Discuss utilities for your development
Send your property information and tell us where the project stands. We’ll discuss the engineering work and coordination needed.
Contact our team