The pre-construction meeting is your last line of defense against costly change orders. Before the machinery rolls in, ensure the entire project team aligns on this checklist:
1. Review of erosion and turbidity control measures.
2. Verification of benchmark control points.
3. Alignment on inspection schedules and request protocols.
4. Discussion of utility conflict resolution paths.