Quattrone & Associates · Southwest Florida
Plan the drainage while there is room to plan the site
Stormwater planning affects how much of a property can be developed and how the finished site will drain. Quattrone & Associates designs stormwater management and drainage systems for commercial, residential, industrial, and institutional projects in Fort Myers and throughout Southwest Florida.
Discuss drainage for your property
Make room for drainage at the beginning
Roads, parking areas, roofs, and landscape areas all affect runoff. The drainage system also has to fit the property’s elevations and available discharge conditions. Leaving those decisions until the site layout is nearly finished can force changes to buildings, parking, or other improvements.
We look at stormwater requirements alongside the civil site plan. That gives owners a chance to understand the land and coordination needed for drainage before committing to a concept.
Stormwater engineering services
- Stormwater management and drainage system design
- Drainage calculations, analysis, and reports
- Retention and detention area design
- Water quality treatment calculations
- Floodplain evaluation and compensating storage analysis
- Environmental Resource Permit applications and agency coordination
The design approach depends on the property’s conditions and the reviewing agencies. A pond is one part of a larger system that can also include inlets, pipes, control structures, and the connection to an approved discharge point.
What shapes the design?
Existing grades, groundwater conditions, surrounding drainage, and the proposed amount of pavement and roof area help define the problem. Available survey information and prior drainage plans are useful starting points, especially when a project connects to an existing development.
Water quality treatment, runoff storage, and floodplain impacts need to be considered together. The appropriate calculations and design criteria are established for the project rather than assumed from a neighboring site.
Coordinate the drainage plans and permit review
Our team prepares drainage documentation and coordinates Environmental Resource Permitting with the South Florida Water Management District and other reviewing agencies as applicable. The drainage plans also need to agree with the grading, paving, and utility documents.
See our site development engineering services for the broader civil design scope and our permitting services for application and review coordination.
Questions worth asking before approving a concept
Where will the site drain? How much space should be reserved for the system? Are there existing permits or drainage agreements that affect the property? Who will be responsible for maintaining the completed system? These are useful questions to raise while there is still room to adjust the layout.
Our stormwater planning guide for site owners explains why pond sizing needs more than a rainfall number. You can also explore the Southwest Florida developments in our project portfolio, including Oak Villages in Fort Myers.
Start with the property information you have
Send the address or parcel identification number, a survey if available, and the proposed use. Existing drainage plans, permit documents, or specific drainage concerns help us understand the work needed.
Discuss drainage for your property
Send your property information and tell us where the project stands. We’ll discuss the engineering work and coordination needed.
Contact our team